to4mk2um
TO4MK2UM
Toronto MKII Umkehr Schedule
This is a historic schedule that works outside of current automated scheduling. This schedule was specifically written to optimize umkehr measurements during the warmer months.
March 3rd through October 9th
This schedule has been run exclusively on Brewer #015
to4mk2um.txt · Last modified: 2026/05/28 20:49 by mbrohart
