ql
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| ql [2021/01/04 16:47] – note added for tl;dr reno | ql [2024/01/17 13:08] (current) – removed pd from the command string as it is redundant reno | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== QL ====== | ====== QL ====== | ||
| + | === Quick UV Lamp Scan === | ||
| + | QL routine is used for performing UV calibrations on the Brewer Spectrometer. | ||
| + | |||
| + | The zenith prism is rotated to the UV dome, FW#2 is set to the "uv FW#2 Pos" recorded in the instrument constants file, FW#1 is set to the 3 position, the iris is opened, and the tracker is rotated to the sun (if the tracker is left powered during the test).\\ | ||
| + | The operator is asked for lamp number, and lamp-diffuser separation (ECCC' | ||
| + | Data is stored in a QLJJJYY.nnn file.\\ | ||
| - | QL routine is normally used for calibrating the instrument' | + | For more information, please |
| - | This routine points the zenith towards the UV port then scans through the wavelengths on both direction and outputs the result to a QL file reflecting the bulb used. There are two variables required, distance from the bulb to the UV dome (ECCC' | ||
| ===== TL;DR UV Calibration===== | ===== TL;DR UV Calibration===== | ||
| **Note**: Before using this section, please go through and understand how to perform the UV calibration via the {{ : | **Note**: Before using this section, please go through and understand how to perform the UV calibration via the {{ : | ||
| - | - Run the pre-calibration command string. \\ For all instruments aside from MKIII:< | + | - Run the pre-calibration command string. \\ For all instruments aside from MKIII:< |
| - | - With the calibration lamp on, check and make sure the zenith offset is correct via < | + | - With the calibration lamp on, check and make sure the zenith offset is correct via < |
| - Run an RU or restart dosbox so it won't run out of string space in the middle. | - Run an RU or restart dosbox so it won't run out of string space in the middle. | ||
| - | - Once the instrument is warmed up to temperature (Usually around 30c) run the uv calibration < | + | - Once the instrument is warmed up to temperature (Usually around 30c) run the uv calibration < |
| </ | </ | ||
| - | - For subsequent bulbs you can run the following without waiting for the bulb warmup (wait time included) < | + | - For subsequent bulbs you can run the following without waiting for the bulb warmup (wait time included) < |
ql.1609778833.txt.gz · Last modified: 2021/01/04 16:47 by reno
