calzs
This is an old revision of the document!
CALZS
Ozone Calibration Schedule
This is a mixed manual and automated schedule. Starting after GMT midnight a diagnostic string to monitor a compliment of instrument functions are collected for assessment. The EO routine is then called to automatically insert SL and HG measurements as needed, takes one UV measurement per hour; prioritize DS during the remaining time available within the hour and also takes ZS measurements periodically and when the DS measurements are too dim.
This schedule was written to prioritizes DS measurements for Ozone calibration with limited UV and ZS also taken throughout the day.
This schedule is not in use normally. It was written for calibration purposes.
calzs.1780064098.txt.gz · Last modified: 2026/05/29 14:14 by mbrohart
