User Tools

Site Tools


ecnouv

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

ecnouv [2026/05/28 21:21] – created mbrohartecnouv [2026/05/28 21:27] (current) mbrohart
Line 2: Line 2:
 ==== No UV Measurement Schedule ==== ==== No UV Measurement Schedule ====
  
-This is an automated schedule that manually schedules daily diagnostics routines then calls the EU routine to  automatically insert SL and HG measurements as needed, four UV measurements; prioritize DS during the remaining time available within the hour and also takes ZS measurements periodically and when the DS measurements are too dim.+This is an automated schedule that manually schedules daily diagnostics routines then calls the EN routine to  automatically insert SL and HG measurements as needed, omits UV measurements; prioritize DS during the remaining time available within the hour and also takes ZS measurements periodically and when the DS measurements are too dim.
  
-This schedule was specifically written to optimize good compliment of measurements from the instrument.+This schedule was specifically written to omit UV measurements.  This schedule is often used if the instrument is showing issues caused by the large range of movement by the micrometers during UV measurement or is used just to acquire a larger compliment of ozone measurements for the site from this instrument. 
  
ecnouv.1780003310.txt.gz · Last modified: 2026/05/28 21:21 by mbrohart